Phone : +86 0769-83482055 / +8615338361334 Email: dg@huanyi-group.com
facebook twitter linkedin google+ printerest
You are here: Home > Technical Literature > The air purifier CADR test chamber and the CCM test chamber's connection method

The air purifier CADR test chamber and the CCM test chamber's connection method

Date: Feb 17,2022 Views: 4232

The CADR test chamber and the CCM test chamber of the air purifier are often used, In the testing process of the air purifier. Let's take a brief look at how these two devices are combined and connected before use.

 

Test equipment: air purifier CADR test chamber, CCM test chamber

 

Manufacturing: Dongguan Huanyi Instrument

 

The air purifier CADR test chamber and the CCM chamber's connection method:

 

1. It can be lifted vertically through the transition conveyor. After the transition conveyor rises, the upper surface of the transition conveyor is horizontally aligned with the lower edge of the CADR chamber isolation door and/or the CCM chamber isolation door; after the transition conveyor is lowered, the upper surface of the transition conveyor is below the lower edge of the CADR chamber cofferdam door and/or the CCM chamber cofferdam door.

 

2. The CADR test chamber is connected with the CADR chamber air intake pipe, the CADR chamber air intake pipe is connected with a temperature and humidity adjustment device and a filter in turn, and the greenhouse temperature adjustment device is located between the CADR test chamber and the filter.

 

3. There are air conditioners and humidifiers inside the temperature and humidity adjustment device, which are used to deliver air to the CADR test chamber and regulate the temperature and humidity of the air entering the CADR test chamber.

 

4. The CADR test chamber is also connected with the CADR chamber exhaust pipe, and the CADR chamber intake pipe is connected with the CADR chamber exhaust pipe.

 

5. The test system also includes the CCM chamber intake pipe, which is connected to the transition cabin; the CCM chamber intake pipe is connected with a branch pipe, and the CCM chamber intake pipe is connected to the CCM test chamber through the branch pipe; a CCM chamber exhaust pipe is connected to the CCM test chamber, and the CCM chamber exhaust pipe is communicated with the CCM chamber intake pipe.

 

Through the above link, the air purifier CADR test chamber and the CCM test chamber are made to complete the test together during the test process. If you have any questions about the product, you can send me a private message.

 

Function and basic parameters of CCM cumulative purification capacity test chamber

The CCM cumulative purification capacity test chamber is mainly used for the limited space device of the purifier's ability to remove target pollutants in the air. It can be CCM test equipment for the cumulative purification capacity of specific pollutants.

 

Test equipment: CCM test chamber/cumulative purification capacity CCM test chamber

 

Manufacturer: Dongguan Huanyi Instrument




Prev New Next New

Contact us

Telphone: +86 0769-83482055 / +8615338361334

Fax: +86 0769-83482056

Email: dg@huanyi-group.com

Add: Building 2, No. 3, Longkeng Xingye Road, Dongkeng Town, Dongguan,China

google+ twitter facebook printerest linkedin
Copyright 2018 by Dongguan Huanyi Instrument Technology Co., Ltd. All rights reserved. Powered by Onepound
Online Service
Top