Phone : +86 0769-83482055 / +8615338361334 Email: dg@huanyi-group.com
facebook twitter linkedin google+ printerest
You are here: Home > Technical Literature > Share the preparation and start-up steps of the high and low temperature test chamber before starting

Share the preparation and start-up steps of the high and low temperature test chamber before starting

Date: Nov 12,2021 Views: 343

   The high and low temperature test chamber is a kind of experimental equipment that inspects the reliability test of high and low temperature or other performance indicators of industrial products under the condition of high and low temperature (alternating) cycles. It is produced for many raw materials and electronic products. It is generally selected by manufacturers, scientific research units, and quality inspection units, and the price is relatively high, so correct operation and maintenance are particularly important. Today, I will share with you the preparation work and start-up steps before starting the high and low temperature test chamber.

 

1. Preparations for the high and low temperature test chamber before starting up and running

 

1. First confirm the power supply and grounding wire;

 

2. The power inlet wire diameter must be equal to or greater than the required wire diameter, otherwise the equipment is heavily loaded during operation, which will easily cause the load to burn out;

 

3. Whether the power cord is properly connected according to the specifications, and confirm the grounding;

 

4. Check whether the over-temperature protector has been set properly (it has been adjusted before leaving the factory, and it is generally not necessary to adjust).

 

2. Operation steps for starting up the high and low temperature alternating cycle test chamber

 

1. First turn on the power of the power distribution cabinet

 

2. Turn on the power supply and water supply switch of the cooling tower. (If it is air-cooled, this step is not necessary)

 

3. Turn on the "main power supply" switch of the test chamber.

 

4. Press the "power switch" on the front panel of the machine, and the control system will be powered on.




Prev New Next New

Contact us

Telphone: +86 0769-83482055 / +8615338361334

Fax: +86 0769-83482056

Email: dg@huanyi-group.com

Add: Building 2, No. 3, Longkeng Xingye Road, Dongkeng Town, Dongguan,China

google+ twitter facebook printerest linkedin
Copyright 2018 by Dongguan Huanyi Instrument Technology Co., Ltd. All rights reserved. Powered by Onepound
Online Service
Top