Phone : +86 0769-83482055 / +8615338361334 Email: dg@huanyi-group.com
facebook twitter linkedin google+ printerest
You are here: Home > Technical Literature > How to prolong the service life of constant temperature and humidity test chamber

How to prolong the service life of constant temperature and humidity test chamber

Date: Jan 11,2022 Views: 310

1. The dust in the condenser of the constant temperature and humidity test chamber needs to be removed, and the condenser should be maintained regularly and once a month.

 

 2. The wet ball tape of the constant temperature and humidity test chamber should be tested and replaced once a year or so.

   

3. After each test, we have to clean the constant temperature and humidity test chamber. This keeps the studio clean and odorless.

 

4. Cleaning and maintenance inside and outside the constant temperature and humidity test chamber.

 

1. Keep the water in the bucket, complete about three tests and wash it once.

 

2. After the test in the chamber, clean it once, and use banana water or detergent to clean it.

 

3. The power distribution room should be cleaned at least once a year. When cleaning, house dust can be removed by hand cleaning or vacuuming.

 

 4. The outside of the chamber must be cleaned more than once a year. Laundry detergent can be used for cleaning, but don't use banana water.

 

5. Check the over-temperature protector, set the high value of over-temperature protection plus 20-30, when the temperature exceeds the over-temperature protector, it will automatically stop running. The overtemperature warning light is on, but the fan is still running. If you run unattended for a long time, please check whether the over-temperature protector is set correctly before running. The wet bulb over-temperature protector is set to 120.

 

6. Use a soft brush to clean the condenser of the constant temperature and humidity test chamber once a year.

 

7. During the test, the samples placed on the sample holder should be placed evenly, and the ventilation openings should not be blocked, so as not to affect the test results.

 

8. The humidifier of the constant temperature and humidity test chamber needs to be checked, and the water in the humidifier should be replaced once a month to prevent dirt in the humidifier. The humidifying water pan should be cleaned once a month to ensure that the water pipes are not prone to clogging.




Prev New Next New

Contact us

Telphone: +86 0769-83482055 / +8615338361334

Fax: +86 0769-83482056

Email: dg@huanyi-group.com

Add: Building 2, No. 3, Longkeng Xingye Road, Dongkeng Town, Dongguan,China

google+ twitter facebook printerest linkedin
Copyright 2018 by Dongguan Huanyi Instrument Technology Co., Ltd. All rights reserved. Powered by Onepound
Online Service
Top