Phone : +86 0769-83482055 / +8615338361334 Email: dg@huanyi-group.com
facebook twitter linkedin google+ printerest
You are here: Home > Technical Literature > How to check the temperature recovery time of the thermal shock test box

How to check the temperature recovery time of the thermal shock test box

Date: Apr 17,2021 Views: 407

        the temperature recovery time of the thermal shock test box is also called the high and low temperature test box. It is mainly used to test the material structure or composite material. It can tolerate the degree of endurance in a continuous environment of extremely high temperature or extremely low temperature in an instant, so that the sample can be tested in the shortest time. Chemical changes or physical damage caused by thermal expansion and contraction.

 

Check the temperature recovery time verification steps of the temperature recovery time of the thermal shock test box:

 

       Install the temperature measuring sensor according to the specified position, and adjust the temperature controllers of the high temperature box and low temperature box to the required standard temperature;

 

     The temperature of the cabinet is raised and lowered respectively, and the self-cooling and thermal shock test chamber is stable for 30 minutes after entering the temperature control state or stable for a corresponding time according to the product technical requirements, and record the temperature value of the measurement point;

 

     the temperature recovery time of the thermal shock test box puts the test load in the high temperature equipment, and selects the corresponding holding time according to the product technical requirements or the regulations of the relevant standards;

 

     Select the conversion time of the temperature recovery time of the thermal shock test box, and then transfer the test load from high-temperature equipment to low-temperature equipment. Pay attention to inspect and record the temperature of the measuring point; then use the same method to perform the opposite conversion of the test load from low-temperature equipment to high-temperature equipment. Inspect and record the temperature at the measuring point;

 

      Record the shortest time required for the test chamber load to change from high temperature (or low temperature) equipment to low temperature (or high temperature) equipment to the temperature of the equipment measuring point to return to the temperature state before the test load is placed.

 

If the above method still fails to complete the calibration, you can contact the manufacturer to solve it.





Prev New Next New

Contact us

Telphone: +86 0769-83482055 / +8615338361334

Fax: +86 0769-83482056

Email: dg@huanyi-group.com

Add: Building 2, No. 3, Longkeng Xingye Road, Dongkeng Town, Dongguan,China

google+ twitter facebook printerest linkedin
Copyright 2018 by Dongguan Huanyi Instrument Technology Co., Ltd. All rights reserved. Powered by Onepound
Online Service
Top