3m3 Three cubic metre environmental test chamber precautions machine maintenance
Today, we are going to tell you about the 3m3 three cubic meters environmental test chamber, which needs attention and maintenance.
1、Cautions
1.1, supplemental humidification water.
After connecting the soft hose tap water with the pure water machine, open the socket switch at the back of the chassis; after the machine power switch is turned on, the water replenishment system will automatically replenish the water. When the water purifier hose is not connected, the water purifier power control switch will be turned off to avoid giving the water purifier no-load operation damage to the motor.
When the humidification of water below a certain lower water level, will automatically give the water purifier power supply, open the water replenishment motor and water replenishment solenoid valve to the water storage tank for replenishment, when the water level reaches a certain upper water level, will automatically disconnect the water replenishment power supply.
1.2, filter cartridge needs to be replaced once every three months to ensure the filtering effect.
1.3. When the machine is in operation, it is not allowed to open the door of the test chamber at any time, but you can view the internal situation through the observation window.
1.4、After the sampling is completed, if the next test is required, the air inside the test chamber needs to be replaced as a whole, first we have to open the chamber door and turn on the fan at the bottom to allow full replacement.
2、Machine maintenance instructions
Inspection and maintenance
1, humidifier inspection and maintenance, humidifier water storage should be replaced at least once every two months to ensure that the water is clean.
2, the condenser is located outdoors, may be due to environmental factors, dust may be more, should be regularly clean * condenser outside the surface of the dust and debris. Regular monthly maintenance should be done, always check whether the condenser air inlet is clean. Cleaning methods can be used vacuum cleaner or broom will be attached to the condenser cooling aluminum dust or the use of high-pressure air spray to remove the dust.
3, the outside of the experimental chamber should be installed in the air conditioning, to ensure that the temperature in the test chamber at RT +5 ~ 30 ° between.
4, cleaning and maintenance.
4.1 Clean all horizontal surfaces daily.
4.2 After 5 days of use, mop the floor with a wet mop
4.3 Cleaning of the inside of the chamber walls after 20 days of use, if necessary.
4.4 If necessary, after 5 days of use or by spraying antistatic dose to ensure good sensor grounding and data recording
5. When the machine is not in use, the power and water supply must be turned off.
Our three cubic metre environmental test chamber and air purifier environmental testing chamber can help solve these worries. In this case the manufacturer in the air purifier factory to do performance testing on a good quality basis, sales to consumers to see the factory report, air purifier environmental chamber test air purifier performance test report!
Environmental instrumentation 3 three cubic meters environmental test chamber literature